Engineering & Design
Select optimal schemes for gas processing plants
With careful analysis, meet product requirements and environmental standards
Improve process control for natural gas heat exchangers
Simulation model shows how to optimize plant controllability and safety
Case history: Replacement of existing pressure vessel
Installing new equipment involves more processes to ensure safety and to meet new codes
Are you losing money when tuning controllers?
Here are 10 rules, if followed, that will result in poor process performance
HP Integration Strategies: Inline blending can help process plants cut costs and reduce quality give-away
In a traditional batch-blending process, the final product composition is created by combining different intermediate products (held in storage tanks) in a blend tank. The objective is to create final..
HP Construction: North America
BioAmber and Mitsui & Co. have partnered to build and operate a manufacturing facility in Sarnia, Ontario, Canada. The initial phase of the facility is expected to produce 17,000 metric tons of biosuc..
HP Construction: Middle East
Tecnimont S.p.A., the main operating company of Maire Tecnimont S.p.A., has an engineering procurement, construction and commissioning (EPCC) contract on a lump-sum turnkey basis for a new fertilizers..
HP Construction: Asia Pacific
Davy Process Technology Ltd., a Johnson Matthey company, and The Dow Chemical Co.’s Oxygenated Solvents Business, have announced that Wison (Nanjing) Clean Energy Co., Ltd., has selected LP Oxo S..
KBR wins technology, engineering design deal for Egyptian ammonia plant
KBR was awarded a contract by Tecnimont for the license and basic engineering design (BED) of a new ammonia plant to be built by Chemical Industries Holding Co. (Kima) in Aswan, Egypt. The plant will support regional development plans in Aswan as well as Egypt’s drive to build modern fertilizer complexes.
Foster Wheeler wins EPCm for BP gas separation project in Scotland
Foster Wheeler has been awarded an engineering, procurement and construction management (EPCm) contract for BP Exploration’s enhanced gas separation project (EGSP) in Scotland. The project is expected to be completed in 2013.
- Yara to rethink U.S. ammonia project if EU suspends carbon levy 1/16
- Larsen & Toubro wins order for hydrocarbon onshore business 1/16
- Veolia and SBM Offshore partner to deploy near-shore, floating desalination units 1/15
- Formosa Petrochemical extends Taiwan cracker shutdown due to weak derivative margins 1/15
- Cargill advances maritime Decarbonization with delivery of first green methanol dual-fuel vessel 1/15
- Key U.S. energy, power trends at home and on world markets 1/15

