Engineering & Design
CB&I wins work on BASF Belgium butadiene project
This award, valued in excess of $50 million, builds on CB&I’s existing relationship with BASF as licensor of its butadiene technology, according to the companies. The plant is scheduled to start up during 2014.
Methanex awards plant engineering deal to Jacobs for Chile-to-US relocation
Jacobs is already executing site-specific engineering and construction management for the 225-acre location in Geismar, La. from its offices in Baton Rouge, with support for the disassembly from its office in Santiago, Chile. The plant is expected to be operational the second half of 2014.
Shell picks Jacobs as European downstream services provider
Under a five-year deal, Jacobs will perform work ranging from feasibility studies and small plant modifications to discrete projects for major Shell refining and chemical sites.
Intergraph extends engineering software alliance with Siemens Energy
The agreement was first signed in 2005. Siemens primarily uses Intergraph’s integrated software tools within the energy sector, it said, with benefits including centralized data storage, automation, enhanced data management and data integrity, and reduced project hours.
Jacobs wins South Africa sulfuric acid plant work
Under the terms of the deal, Jacobs is designing the equipment and process for two final acid towers. The company is also designing and fabricating a proprietary anodically-protected sulfuric acid cooler, which will be manufactured at Jacobs' facility in Pickering, Ontario. Financial terms were not disclosed.
UOP technology chosen to boost yields at Romania synthetic rubber plant
Energy Bio-Chemicals will use UOP’s KLP process to purify butadiene, a monomer used to produce synthetic rubber, at the company's CAROM Onesti styrene-butadiene rubber (SBR) facility. The project is part of a modernization investment program to upgrade butadiene installation and increase production.
Modernize your compressor lube- and seal-oil systems
Each pipe or control line should be traced to its origin, the design intent must be well understood, and all owner-purchaser questions answered by the vendor-manufacturer.
Utility piping: Why over-engineering is inefficient
Grooved mechanical piping can offer improved constructability, speedy expansion, retrofit and turnaround, and also reduce safety risks. It is a quality pipe-joining method.
Consider new developments for variable-speed electric motors
New challenges, recent developments, the latest mechanical issues and main reliability factors for large variable-speed electric motor drivers in HPI plants are presented here.
Improve performance monitoring of your turbomachinery
This case study documents the performance variables to consider and apply when monitoring and tracking the efficiency deterioration for a steam turbine using DSs in a PI process book.
- China's first coal-to-chemicals project with green hydrogen starts commercial operations 11/20
- Norsk e-Fuel and Braskem partner to turn captured carbon into long-lasting products 11/20
- Nigeria's Dangote refinery delays CDU maintenance to end of January 2026 11/20
- Technimont attends ground-breaking ceremony of Tengiz Gas separation Complex in Kazakhstan 11/20
- 42% of U.S. energy/critical infrastructure providers exposed to weaponized AI and email attacks 11/20
- EIA: U.S. crude stocks fall on higher demand, fuel inventories rise 11/20

