Rotating Equipment
Analyzing gear failures
Use this information to identify and eliminate problems
Effective machinery monitoring: getting the most for your investment
Here's why, when, where and how to make the effort
Understand dry gas seals
Use these guidelines for a successful installation
Reciprocating compressor condition monitoring
Ensure your system includes these capabilities
Understand centrifugal compressor, equipment interaction
Operating scenarios provide insights into predicting behavior during changes
Simple equations for pipe flow analysis
Calculations apply to a wide range of Reynolds numbers
Influence of piping vibration on pump shaft cracks
Vibration analysis found the problem
Improve valve and pump sizing
Understand how flow system components interact for more efficient designs
Multivariable control increases coke unit, refinery throughput
A maximization function allowed a 4.1% feed increase
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

