Rotating Equipment
Explicit friction factor correlation for pipe flow analysis
Use this representation of the universal law of friction to obtain accurate estimates
Pump control strategies benefit from compressor know-how
Similar techniques can be used to avoid problems with parallel operation
Use gas conditioning to improve compressor gas seal life
Here's how to ensure a continuous supply of clean and dry buffer gas
Revamp induced-draft fan performance
Follow these six steps to ensure nothing is overlooked
Use of oil-injected screw compressors in a special fuel gas boosting service
They offer advantages compared to centrifugal and reciprocating types
NPSHA —how much is enough?
Follow these guidelines to avoid pump damage
Cure liquid carryover from compressor suction drums
Here's how to apply mist eliminators for higher throughput and efficiency
Improve FCC yields to meet changing environment—Part 2
Controlling emissions is another vital component for revamp projects
Behavior of dry-running piston rod sealing systems in crosshead compressors
Various designs and materials were investigated
Designing small-bore piping and valve connections
Follow these guidelines to improve reliability
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

