Project Management
Wide design margins do not improve engineering
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
HP Automation Strategies: ISA108 Intelligent Device Management focuses on work processes
Over the last decade, field instrumentation and analytical chemistry device suppliers have made tremendous progress incorporating value-added functionality into intelligent devices. This includes enha..
HP Water Management: Best practices for RO operations
Widespread use of reverse osmosis (RO) technology in industrial applications began in the late 1980s, following the introduction of polyamide materials that had a significantly higher permeate flow an..
Aramco picks Foster Wheeler to engineer Fadhili gas processing program
Foster Wheeler will execute the FEED for the grassroots Fadhili gas plant, which has a planned total processing capacity of 1.5 billion standard cubic feet per day (BSCFD) of non-associated gas.
Jacobs to provide program management at new US nitrogen fertilizer facility
Construction of the plant is expected to begin in November of 2014 and take three years to complete. Once operational, Midwest Fertilizer will make nitrogen-based fertilizers to supply domestic demand.
Neste Jacobs wins project management work for Gasum’s Finngulf LNG
The PMO office will in 2014, together with the other FEED engineering companies for the individual sub projects, prepare the material in order to enable Gasum to make the final investment decision for the combined Finngulf LNG investment, including Balticconnector, by end-of-year 2014.
Freeport LNG chooses CB&I, Zachry Industrial to build first two trains
CB&I and Zachry Industrial have been awarded two contracts, each valued at $2.5 billion, to construct the first two LNG trains of the Freeport liquefaction project in Texas.
Amec awarded services pact for Kuwait refineries
Amec will be responsible for a range of engineering and management services including feasibility studies, front end engineering design, project management consultancy services and training of Kuwaiti engineers.
Mitigate heat exchanger corrosion with better construction materials
Better materials can provide optimal equipment service life, reduce maintenance, mitigate contamination by corrosion products and minimize heat loss due to fouling.
HP Integration Strategies: Engineering design tools are moving to the ‘cloud’
According to a new market study on engineering design tools, new 3D design applications can play an integral part in determining the optimal design, creation and construction of HPI facilities.
- Kazakhstan to build a new $10-B, 10-MMtpy refinery 2/18
- U.S. EPA expected to send 2026 biofuel blending quotas to White House this week 2/18
- Kent awarded pre-FEED contract for Eq.flight, an advanced power-to-liquids SAF project 2/18
- ABB launches integrated carbon capture measurement solution to accelerate industrial decarbonization 2/18
- CONSER awarded technology licensing/PDP contract for DMS and BDO plant in China 2/18
- Singapore marine fuel sales maintain strong start in early 2026 2/18

