Project Management
Update on lubrication systems
Several case histories illustrate the pros and cons for maintaining rotating equipment under various plant conditions.Example 1In late May 2013, a US oil-mist provider in one of the Great Lakes states..
Control moisture in ‘wetted’ rotating equipment
In turbomachinery, water is one of the most deleterious contaminants. Left unchecked, moisture can severely reduce the service life expectancy of oil-wetted rotating and reciprocating components by as..
Wide design margins do not improve engineering
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
HP Automation Strategies: ISA108 Intelligent Device Management focuses on work processes
Over the last decade, field instrumentation and analytical chemistry device suppliers have made tremendous progress incorporating value-added functionality into intelligent devices. This includes enha..
HP Water Management: Best practices for RO operations
Widespread use of reverse osmosis (RO) technology in industrial applications began in the late 1980s, following the introduction of polyamide materials that had a significantly higher permeate flow an..
Aramco picks Foster Wheeler to engineer Fadhili gas processing program
Foster Wheeler will execute the FEED for the grassroots Fadhili gas plant, which has a planned total processing capacity of 1.5 billion standard cubic feet per day (BSCFD) of non-associated gas.
Jacobs to provide program management at new US nitrogen fertilizer facility
Construction of the plant is expected to begin in November of 2014 and take three years to complete. Once operational, Midwest Fertilizer will make nitrogen-based fertilizers to supply domestic demand.
Neste Jacobs wins project management work for Gasum’s Finngulf LNG
The PMO office will in 2014, together with the other FEED engineering companies for the individual sub projects, prepare the material in order to enable Gasum to make the final investment decision for the combined Finngulf LNG investment, including Balticconnector, by end-of-year 2014.
Freeport LNG chooses CB&I, Zachry Industrial to build first two trains
CB&I and Zachry Industrial have been awarded two contracts, each valued at $2.5 billion, to construct the first two LNG trains of the Freeport liquefaction project in Texas.
Amec awarded services pact for Kuwait refineries
Amec will be responsible for a range of engineering and management services including feasibility studies, front end engineering design, project management consultancy services and training of Kuwaiti engineers.
- Ducor Petrochemicals, Blue Circle Olefins partner to create a fully circular supply chain for polypropylene 11/18
- World's first: Air Liquide’s innovative technology converts ammonia into hydrogen at industrial scale 11/18
- Borouge to supply advanced polyolefin solutions for next-generation vehicles 11/18
- ASTM International signs MoU with Gulf Cooperation Council Laboratory Company for Technical Services (GCC Lab TSCo.) 11/18
- KBC launches Visual MESA Energy Management System 7.3 11/18
- MHI Compressor secures steam turbine contract at Baton Rouge (U.S.) olefins plant 11/18

