Piping
Mustang’s MSA in Colombia
Ecopetrol S.A. has awarded Wood Group’s Mustang a two-year master service agreement (MSA) to provide pipeline engineering expertise and related services in order to optimize engineering design and maximize operating efficiencies, with the goal of increasing Colombia’s oil and gas production transmission capacity and safety.
Finetune boil-off gas generation from refrigerated storage facilities
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Loss Prevention
/ Natural Gas
/ Piping
Improved estimation methods accurately calculate vaporized product for LNG and LPG storage and transfer systems
Case 57: Troubleshooting the cause of sudden impacts
Maintenance & Reliability
/ Compressors
/ Drivers
/ Economics
/ Engineering & Design
/ Motors
/ Piping
/ Pumps
/ Rotating Equipment
/ Safety
Finding the cause can be elusive but calculations help
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

