Piping
HP Gas Processing: US midstream expansion hits Utica shale
Significant expansion is planned for the midstream oil and gas sectors in 2014, following a 263% increase in midstream capital spending to $46.4 billion (B) in 2013, according to Deloitte.1 A five-yea..
HP Innovations
Innovations for February 2014.
Wide design margins do not improve engineering
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
HP Engineering Case Histories: Case 76: Simple troubleshooting analysis tips are useful
Analyzing failed parts or poor operation requires the proper skills and equipment. Sometimes these investigations are not always very difficult. Often, troubleshooting a failure just requires a logica..
Recommended guidelines can help prevent fires caused by static electricity
For any person working in the oil and gas industry who is responsible for the safety of employees, colleagues, plant equipment and property, one of the most potentially confusing aspects in providing ..
HP Innovations
ClearSign marks NOx reduction milestoneClearSign Combustion Corp. has cost-effectively reduced NOx to a record-setting 3 ppm. The results indicate that ClearSign’s technology may overcome many of..
HP Reliability: Leaders must allocate time for technology updates
Just as a good medical doctor is expected to have wide knowledge on modern treatment options, we would expect reliability professionals to be equally informed on technology advances. There are numerou..
Use a simulation tool for multi-commodity pipeline scheduling
Pipeline transport represents one of the most important means of moving oil derivatives to different locations. It is both a reliable and inexpensive means of transport, and it yields small variable c..
Improve pressure drop calculations for saturated water lines
When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
Exxon Arkansas pipeline rupture blamed on defect
An independent report found that a rupture in an ExxonMobil pipeline that spilled thousands of barrels of oil in Arkansas earlier this year was caused by defects dating back to when the pipe was built in the 1940s.

- Jinggong Group, Yokogawa sign multi-faceted strategic partnership on mutual business development 6/11
- USA BioEnergy secures long-term feedstock supply for $2.8-B SAF refinery in Texas (U.S.) 6/11
- GameChange Solar secures 450-MWp order for green ammonia project in Oman 6/11
- Russia's offline primary oil refining capacity revised up 21% in July 6/11
- Borouge awards ADNOC L&S 15-year contract to accelerate growth of UAE petrochemical exports 6/11
- TOYOTA GAZOO Racing unveils liquid hydrogen-fueled "GR LH2 Racing Concept" at Le Mans 6/11