Gas Processing/LNG
Burckhardt Compression commissions compressor on FSRU in Dubai
Burckhardt Compression successfully completed the mechanical test run of the Laby-GI compressor on Golar’s FSRU "Golar Freeze" in the presence of DNV (Det Norske Veritas). Commissioned by Burckhardt Compression and Golar LNG, the compressor is currently operating at full capacity.
Targa Resources Partners to provide NGL transportation for Eagle Ford Shale
Targa Resources Partners has announced that an exclusive non-binding memorandum of understanding (MOU) has been signed with TexStar Midstream Services and TEAK Midstream for the development of a new pipeline to transport natural gas liquids (y-grade) from processing facilities in the Eagle Ford shale to Mont Belvieu, Texas, and a new fractionation train at the Targa Resources Partners operated Cedar Bayou fractionation facility (CBF).
Black & Veatch-patented technology featured in Asia’s largest natural gas plant
Black & Veatch is providing its patented interstage cooling technology at the Puguang natural gas plant in Sichuan Province, China. The plant is expected to supply energy to Shanghai.
Terasen Gas receives approval to use pipeline-quality biogas in British Columbia
Terasen Gas has received approval from the British Columbia Utilities Commission (BCUC) for a new renewable natural gas program for an initial two-year period.
Aker Solutions wins contract for gasification and liquefaction plant in US
Medicine Bow Fuel & Power LLC has awarded Aker Solutions the front end engineering and design (FEED) package for its Medicine Bow industrial gasification and liquefaction plant located near the town of Medicine Bow, Wyoming.
NTSB updates investigation into fatal pipeline rupture
This is an update on the continuing investigation of the natural gas pipeline rupture and explosion that killed eight people in San Bruno, Calif., on September 9, 2010.
RasGas Selects GE emission-reducing technology
Demonstrating its commitment to supporting Qatar’s regulatory requirements regarding nitrogen dioxide (NOx) emission levels, RasGas is applying GE’s dry low NOx (DLN) combustion technology to reduce gas turbine emissions at its LNG complex in Ras Laffan Industrial City, Qatar.
Foster Wheeler acquires sulfur recovery technology from FLSmidth & Co.
Foster Wheeler AG’s Global Engineering and Construction Group has acquired the CEntry sulfur recovery proprietary technology from FLSmidth & Co. The acquisition includes patents, know-how and skilled personnel.
GE gas engines used in Philippines’ gas power plant
Bacavalley Energy Inc. and GE have inaugurated the first landfill gas power plant in the country to feature GE’s Jenbacher gas engines.
Best practices in treating liquefied petroleum gas are defined
Advantages of removing H2S before the LPG unit and energy optimization of the LPG splitter
- Ducor Petrochemicals, Blue Circle Olefins partner to create a fully circular supply chain for polypropylene 11/18
- World's first: Air Liquide’s innovative technology converts ammonia into hydrogen at industrial scale 11/18
- Borouge to supply advanced polyolefin solutions for next-generation vehicles 11/18
- ASTM International signs MoU with Gulf Cooperation Council Laboratory Company for Technical Services (GCC Lab TSCo.) 11/18
- KBC launches Visual MESA Energy Management System 7.3 11/18
- MHI Compressor secures steam turbine contract at Baton Rouge (U.S.) olefins plant 11/18

