Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Safety

Flare stack structure revamp: A case history

Reliance Industries Ltd.: Singh, S.

An innovative approach was used to repair an older flare structure online without an extensive shutdown

Chemical Facility Anti-Terrorism Standard turns four: What’s next?

ADT Advanced Integration: Loughin, R.

An in-depth look at the standard

Process safety: Blind spots and red flags

Mustang Engineering Inc.: Shephard, T.

Improving safety for organizations involve more than technological solutions; understanding processes and plant interactions are a must

HP Reliability: Oil mist and electric motor windings

Hydrocarbon Processing Staff: Bloch, Heinz P.

We often get questions relating to oil mist and how it affects electric motor windings. For a quick answer, contact us at Gulf Publishing via e-mail. We’ll steer you in the right direction by exp..

How would you rate leadership of your capital projects?

Consultant: Patty, R. M.  |  Denton, M. A.

To achieve substantially improved benchmarks in project performance, profound change is needed

What are the ‘magnificent seven’ elements to successfully pick a contractor?

Valuable pointers help industrial plant managers minimize downtime, maintain quality and safety to improve operations

How to fabricate reactors for severe service

Walter Tosto SpA: De Colellis, M.  |  Quintiliani, D.  |  Fossataro, G.

Many critical factors are involved in the design and welding of hydrocracking reactors

Minimize carbon footprint from Claus tail-gas units

Linde AG: Heisel, M.
WorleyParsons: Rameshni, M.

Reevaluate emissions efficiencies on sulfur-removal operations

Avoid these risks concerning combustion control in fired heaters

Servomex: Jenkins, R.

Tuneable diode laser analyzers offer diagnostic benefits

Circumvent design issues when adding new hydrotreating units

A-Evangelista, S.A.: Marchetti, M. H.

Follow these guidelines for substantial capital cost savings with existing flare systems