Pumps
HP Reliability: How pump installation must differ from the way pumps were shipped
In general, process pump manufacturers are asked to provide pumps as a "set" or assembled package comprising pump, driver and baseplate (Fig. 1). After ascertaining correct shaft separation to accommo..
Think power pumps are self-priming? Think again!
Think power pumps are self-priming? Think again!
NPSHA —how much is enough?
Follow these guidelines to avoid pump damage
Improve FCC yields to meet changing environment—Part 2
Controlling emissions is another vital component for revamp projects
Consider precast polymer concrete pump foundations
Features include faster installation, improved corrosion resistance and lower vibration levels
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Verso Energy awards FEED contract to Rely for the DEZiR eSAF project 11/17
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

