Project Management
Power: Temporary power tips for turnarounds and maintenance activities
Maintenance activities and turnarounds often prove challenging to a facility’s electrical power system.
Project Management: Check installation of the tray column before box-up
To push the project schedule, plant owners sometimes proceed the boxing up of columns without approval of the tray designer.
Digital: Cloud-based dynamic simulation models amplify operator training and safety programs
International oil and gas (O&G) and hydrocarbon processing industry (HPI) companies are under great pressure to be profitable.
Viewpoint: Downstream expansions will accelerate needed production growth
Two transformative drivers—global economic growth averaging more than 3%/yr and the world population expanding to more than 9 B by 2040—will have the net effect of adding another India and China to today’s global energy demand.
Reliability: Safe fluid machines are our responsibility
Early in our training as engineers, we developed the ability to collect and evaluate data.
Editorial Comment: Where some see roadblocks, we see opportunities
In the January issue of Hydrocarbon Processing, the editorial comment focused on the roadmap to advancing ideas.
Business Trends: How plastics waste recycling could transform the chemical industry
If plastics demand follows its current trajectory, global plastics-waste volumes would grow from 260 MMtpy in 2016 to 460 MMtpy by 2030, taking what is already a serious environmental problem to a new level.
Comparative analyses of common project execution alternatives
With major projects (FIG. 1), alternatives are generally considered in overall project execution and in construction.
Ultra-deep desulfurization of FCC gasoline: Reactive adsorption strategy
With an increase in concern for the environment, countries around the world are implementing stringent environmental regulations and are continuously pressuring refiners to reduce the amount of sulfur in transportation fuels—primarily gasoline and diesel—to combat airborne pollution caused by vehicles.
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
- Borouge to supply advanced polyolefin solutions for next-generation vehicles 11/18
- BGN announces strategic MoU with XCF Global to produce and supply SAF 11/17
- KazMunayGas and Uzbekneftegaz partner to build 50,000-tpy linear alkylbenzene plant 11/17
- Chevron joins race to explore potential purchase of Lukoil assets, including refineries 11/17
- Abra Group and Sumitomo sign MoU to advance affordable SAF in Brazil 11/17
- Sonatrach signs contract for unit with Sinopec subsidiary to boost gasoline production capacity 11/17

