Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Maintenance & Reliability

Coke drum and blowdown system overpressure protection design - Part 1

The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.

Digital: Digitalization—Why now?

KBC, a Yokogawa Company: Micklem, D.

The process industries are under threat.

Fluid Flow: Retrofit for reliability with Coriolis flowmeters

Emerson Automation Solutions: Gentile, A.

Aging infrastructure has become a much-talked-about issue across the hydrocarbon industry.

Maintenance: Mind the small stuff—Tips to manage particle contamination

Sun Coast Resources, Inc.: Goldman, T.

Particle contamination in lubricants is the primary cause of lubricant-related equipment failure and hydraulic system failure, according to industry studies.

Reliability: Where asset reliability must begin in refineries and petrochemical plants

Hydrocarbon Processing Staff: Bloch, Heinz P.

Numerous articles on asset reliability have been published in the decades since 1970.

The critical maintenance team: Do you have one?

Consultant: Thorman, G.

Larger plants typically have planners and maintenance supervisors onsite, as well as operations personnel.

Application of ring-type joint gaskets in a refinery

SK Energy: Lee, S.  |  Lee, S. H.  |  Jeon, S.
SK Innovation Co. Ltd.: Jang, T. Y.

In refineries and petrochemical plants, ring-type joint (RTJ) flanges have been applied to high-pressure processes or sensitive areas that are susceptible to leaks.

Fabrication of clad equipment and piping—Part 2

Fluor: Shargay, C.  |  Carmona, R. K.  |  Daru, K.  |  Desai, J.  |  Irfan, M.
Reliance Industries Ltd.: Panchal, A.

For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.

How did asset utilization modeling save Sadara $1 B in capital cost?

Sadara Chemical Co.: Hayek, F.  |  Moran, M.

Sadara is a JV between Saudi Aramco and Dow Chemical.

Digital: Three steps to implement a 21st-century disaster recovery plan

Allegro Development Corp.: Cox, E.

In the wake of Hurricane Florence, businesses across the US had another reminder of how unpredictable and unavoidable disasters are when they strike.