Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Loss Prevention

Automation improves asset reliability for refiners

Nalco Company, Energy Services Division: Gerty, M.

Several case studies illustrate how automating boiler systems can yield tremendous improvement in equipment uptime and lower total operating costs

HP Reliability: Not ready for 29-year-old pump packing

Hydrocarbon Processing Staff: Bloch, Heinz P.

In 2009 we were informed about “a nuclear plant that was never commissioned after its original construction. This plant has been sitting idle for 29 years and is only now starting up.” The o..

HP Integration Strategies: The three dimensions of energy management

ARC Advisory Group: de Leeuw, V.  |  Güldner, F.

While we’ve seen many examples of good practices in energy savings and efficiency initiatives, and hear much discussion about the merits of energy-management systems (EMSs), energy management lac..

Advice for 2011: Be dynamic, be flexible; more pain to come

Hydrocarbon Processing Staff: Wright, Tim L.

“Analyze this” is the fad quote and action that actor Robert De Niro famously demands of his unwilling therapist in the film of the same name. Playing Paul Vitti, a New York gangland supremo..

Design and implement an effective equipment integrity management system

TEFEN Venture Consulting Italy: Nicolo, F.
ERG Raffinerie Meditterranee SpA: Spampinato, M.

Consider this "integrity-only-specific" innovative methodology

Facility siting—balancing risk vs. cost

Brad Adams Walker Architecture, P.C.: Walker, B. A.

Companies should take a second look at identifying and analyzing hazards associated with temporary buildings

Rethink your overpressure systems

Petrofac Engineering & Constructions: Rahimi Mofrad, S.

Consider multiple relief valve designs

Maximize uptime for sulfur testing

Thermo Fisher Scientific: Van der Windt, R.  |  Van Strien, A.

New analyzer determines trace level amounts quickly

Better manage vacuum on gas systems

WorleyParsons: Datta, K. A.

A systematic approach estimates optimum conditions to prevent air ingress for flares

Tower pressure relief calculation

Petrofac Engineering & Constructions: Rahimi Mofrad, S.

A practical, less-complicated method for different emergency cases