Loss Prevention
Risk mitigation procedure following criticality assessment and FMEA
In asset performance management (APM), criticality assessment and failure mode and effects analysis (FMEA) are powerful tools that enable the identification of opportunities to minimize asset lifecycle costs during the development of equipment strategies.
Process control reimagined
Imagine visiting the control room of a typical process unit at a refinery.
Separating from the competition: Recovering profits after the pandemic
As recovery from the COVID-19 pandemic begins, so will a return to normal life.
Good distributor design for high-velocity feed debottlenecks a crude preflash tower
Bazan Group’s crude unit No. 3—not designed by any of the authors’ companies—was bottlenecked by the preflash tower.
Vapor velocity guidelines for horizontal flare knockout drums
Flare knockout (KO) drums are important components of effluent handling systems.
Restaging/rerating of centrifugal compressors: Fundamentals, practices and challenges
The primary requirement for rerating or revamping an existing centrifugal compressor is to match the new operating requirements, such as increased or decreased flow, increased or decreased head, or a combination of both. Rerating or revamping is necessary where the existing compressor or compressor train is incapable of meeting the new operating requirement efficiently.
Quantum leap in chemical plant safety and reliability through mobile technology
The human factor has played a significant role in chemical plant accidents and production loss incidents over the past 60 yr.
Ensuring safety in dynamic chemical manufacturing environments
As with all industries, chemical manufacturing is evolving in response to technical innovations, new customer requirements and increased global competition.
Executive Viewpoint: It was the best of times
“It was the best of times, it was the worst of times, it was the age of wisdom, it was the age of foolishness…”. Fortunately, this opening line from A Tale of Two Cities does not often present itself as an appropriate analogy to the oil and gas industry. Yet, here we are.
Engineering Case Histories: Case 112: Remote failure analysis consulting
An article on “Remote training of personnel”1 is interesting and appropriate at this time of COVID-19. It outlines the difficulties in presenting remote training courses and suggests methods that can help.
- Tasnee's Saudi Ethylene and Polyethylene Co. commences planned maintenance of ethylene plant 1/2
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30

