Gas Processing/LNG
HP Forecast: 2015 downstream forecast reaches all-time high
In 2015, the HPI’s capital, maintenance and operating budgets are expected to exceed $324 B. Global announced project spending continues to surge to satisfy increasing demand for petroleum products.
HP Industry Metrics
Oil prices continued their downward plunge throughout October and into early November. The decline is due to bearish market fundamentals accompanied by a strong US dollar. Saudi Arabia is not expected..
HP News
DOE study examines impacts of US LNG exports The US Department of Energy’s office of Fossil Energy (DOE/FE) recently completed a study on the impact of exporting LNG on the US energy market. Ther..
Globally, the HPI is building new capacity
The HPI continues to expand to meet increasing demand for energy, transportation fuels, and petrochemical-based consumer products. As confirmed by HP’s HPI Market Data 2015 forecast, numerous construction projects are under various stages of development for the refining, petrochemical and gas processing/LNG industries.
CB&I to build hydrogen plant for Kansas refinery
The project scope includes the engineering, procurement, fabrication and field construction of a 22 million standard cubic feet/day hydrogen plant at its refinery in Coffeyville, Kansas.
BMW recommends Shell as global supplier for aftermarket engine oils
Base oil is the main component of finished oils and plays a vital role in the quality of the finished engine oil. The base oil is produced at Shell's Pearl GTL plant in Qatar.
HP Industry Metrics
Mid–October crude oil prices slumped as the International Energy Agency (IEA) announced a slight increase in global oil demand by 700 Mbpd. In contrast, oil production is forecast to increase by ..
2015 global downstream spending projected to jump to all-time high
The HPI's total capital, maintenance & operating budgets are expected to exceed $324 B in 2015, representing an all-time high. Global announced project spending is also up.
CB&I to design gasification unit for China’s Sincier
The unit will utilize CB&I's proprietary E-GasPlus technology for a three-train facility to produce syngas for hydrogen, fuel gas and power. This plant will have the capability of operating on coal and petroleum coke, or a combination of these fuels with a liquid or solid residue from an upstream hydrocracking unit.
Louisiana LNG Energy chooses Bechtel to design new gas-export facility
The design will center on a modular approach, which shortens the construction schedule and accommodates future expansion. The new facility will have an initial export capacity of 2 million tpy.

- LanzaJet expands partnership with Microsoft to strengthen the company’s global growth 6/13
- Phelan Green Group's $2.6-B eMethanol project remains on schedule 6/13
- Algeria launches $7-B investment plan to expand hydrocarbon processing 6/13
- AFPM/API: President Trump officially overturns California (U.S.) gas car ban 6/12
- Decision on oil refiner Italiana Petroli's sale expected around end-June 6/12
- EIA: U.S. crude stocks fall, gasoline and distillate inventories rise as refining activity increases 6/12