Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Gas Processing/LNG

Industrial qualification of a new transfer system

GDF Suez: Le Cloirec, A.  |  Loisel, P.  |  Machouat, F.  |  Maocec, D.  |  Peigne, A.  |  Rombaut, G.

LNG tests for cryogenic flexible hose technology demonstrates applications for open sea conditions

Reduce air emissions from natural gas vaporization units

Black & Veatch: Hollenback, R. J.  |  Price, B. C.  |  Rosetta, M. J.

New revaporizing method mitigates air pollutant releases while maintaining process efficiency

Natural gas, the clean fuel

CD&W, Inc.: Speight, J. G.

Emissions control and environmental aspects

What is the outlook for building new LNG facilities?

Fluor Corp.: Phalen, T.  |  Scotti, J.

Rising construction costs will play a large part in determining what plants are built

HPIn LNG: Growing challenges over financing LNG projects

Consultant: Mokhatab, S.

 Liquefied natural gas (LNG) projects are capital intensive! They have a very long period for capital expenditures, which include design, procurement and construction phases, before generating an..

LNG technology—The next chapter

KBR: Caswell, C.  |  Durr, C.  |  Kotzot, H.

Technical challenges of new plants will involve the sizing of trains, construction cost controls, onshore vs. offshore, energy efficiencies and environment

Developing mid-scale LNG projects from the contractor's perspective

Black & Veatch: Fossella, J.  |  Hoffart, S.  |  Price, B. C.  |  Price, B. S.

Modular liquefaction methods reduce construction and operating costs for smaller reserve developments

HPIn LNG: Will LNG liquefaction project development prosper?

Fluor Corp.: Phalen, T.

Since 1995, the volumes of liquefied natural gas (LNG) delivered have risen at a rate of over 7%/yr. Forecasts indicate that LNG deliveries will continue to grow at this rate over the foreseeable futu..

Optimize LNG plant reliability

Petronas LNG Complex Sdn Bhd: Abdul Rahman, J.
Shell Technology India Pvt Ltd.: Beeby, C.
Shell Global Solutions International BV: Den Bakker, K.  |  Parra Calvache , M.

Controlling heat exchanger cool-down increases efficiency and availability

Improve amine absorber operations

Fluor, S.A.: Amaris, J.  |  Pironti, F.
Petrogal, S.A.: Grilo, J.  |  Inverno, J.  |  Ponthina, A.  |  Teiga, L.

Follow these three easy steps to find more flexibility in absorber systems