Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Equipment

Viewpoint: Shifting safety from cost to value for oil and gas companies

Schneider Electric: Elliott, S.

In today’s business and regulatory environment, controlling a refinery or other high-hazard processing plant is increasingly demanding.

Inspection: External visual inspection remains vital

Contributing Editor: Anwer, A.

Innovations continue to evolve at a steady pace.

Editorial Comment: The materials that advance modern life

Hydrocarbon Processing Staff: Nichols, Lee

Refineries and petrochemical plants contain some of the harshest environments on the planet.

EPC/construction contracting—Start with the end in mind

Praxair: Ogunye, S.

Large capital projects continue to be challenged by budget issues.

Stable thermosiphon reboiler operation: With or without a valve in the inlet piping?

Fluor: Kister, H.  |  Van Doorn, E.

A reboiler provides the necessary heat duty for the separation in a distillation tower.

Best practices in boiler maintenance and replacement

Rentech Boiler Systems: Lara, G.

Refineries cannot afford a sudden boiler failure (FIG. 1). Regularly assessing the condition of boilers is vital.

Resolving vibration problems in a crude booster pump

Saudi Aramco: Rinawi, A.  |  Brashler, K.  |  Subaie, E.

The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.

Feed nozzle effects on yields and operation of FCCUs

Tüpraş: Genç, M.  |  Karani, U.  |  Emiroglu, I.  |  Er, I.  |  Sönmez, M.  |  Gül, A.  |  Avcilar, S.
Honeywell UOP: Lall, J.

The first-generation, proprietary feed distributorsa had open-pipe bayonets that were located at the base of the wye section/riser.

Hyper-duplex stainless steel can improve on duplex steel and nickel-based superalloy

Sandvik Materials Technology: Vieira, B.

Duplex materials have been around for a long time.

Fabrication of clad equipment and piping—Part 1

Reliance Industries Ltd.: Panchal, A.
Fluor: Carmona, R. K.  |  Daru, K.  |  Desai, J.  |  Irfan, M.  |  Shargay, C.

For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.