Equipment
Selecting the right welded-metal bellows seal
Understand the differences to get the most effective product for the application
Modeling two-phase flow in horizontal pipe bends
New calculations of pressure loss and predictions of flow pattern in bends
Reliable sealing technologies reduce maintenance demands
The latest connection and sealing options offer zero-leak integrity and minimized maintenance
Explicit friction factor correlation for turbulent flow in rough pipe
A comparison of approximation methods shows which is more accurate over a wide range of Re values
Changes in process piping code ASME B31.3 for 2004
The revisions and how they impact piping system design are highlighted
Consider dividing wall distillation to separate solvents
Using an established technology as part of a revamp installation provided new products at lower capital and operating costs than conventional methods
Explicit friction factor correlation for pipe flow analysis
Use this representation of the universal law of friction to obtain accurate estimates
Avoid pipe corrosion under insulation
Keys are proper selection, installation and maintenance
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TotalEnergies extends its fuel price cap policy in France until the end of April 4/7
- Navigating the montan wax challenge with renewable alternatives for polymers 4/7
- AFR selects Axens as technology provider for Texas (U.S.) refinery 4/7
- Iran's Revolutionary Guards say they targeted petrochemical facilities in the Gulf 4/6
- Damietta Green Ammonia completes pre-FEED for $873-MM, 150,000-tpy green ammonia facility 4/6
- EIB and Eni sign €500-MM in financing for new biorefinery in Sannazzaro de’ Burgondi 4/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

