Environment & Safety
Project Management: Reduce installation schedule for column trays
The implementation of a project schedule must avoid slippage, which can lead to budget overruns and delays in commissioning and production. Conversely, a reduction in project schedule results in an early startup of the plant, creating advantage for stakeholders. Customers often demand reductions in schedule timelines, which can be difficult for engineering, procurement and construction (EPC) contractors to implement. New innovations like concurrent engineering, modular construction, prefabricated pipe racks and structures, etc., are already in practice.
Reliability: Phased reopening of reliability improvement businesses
Like many thousands of educational and operator training-related endeavors, reliability improvement training was abruptly suspended when the COVID-19 pandemic interrupted daily life as it was known prior to 2020.
Editorial Comment: Optimizing operations and recognizing achievements
Over the next two months, <ital>Hydrocarbon Processing</ital> will host two separate events for a global audience. One will gather the brightest minds in the industry to share the latest innovations and technologies in the industry, while the other will recognize the leaders in advancing the industry toward safer and more reliable, sustainable and profitable operations. Both events—<ital>Hydrocarbon Processing’s</ital> IRPC and the HP Awards—will be streamed on digital platforms and free to view.
Business Trends: Managing risk and uncertainty: The importance of optimizing your value chain
No doubt exists that COVID-19 is disrupting the oil and gas industry. Oil prices are falling, demand is down, supply is up, and storage capacity is limited. In these difficult times, the industry must swiftly act to keep business viable to come back strong when conditions improve.
Executive Viewpoint: How to develop a successful asset management strategy during the coronavirus downturn
The coronavirus (COVID-19) has disrupted all sectors of the oil and gas industry, including asset management.
Advanced cooling tower water treatment—Part 1
Refineries, petrochemical plants and similar facilities rely on a significant number of heat exchangers for process control and product formulation throughout the plant.
Fit-for-purpose fireproofing envelopes
Although widely used, the term “fireproofing” is misleading as almost nothing can be made totally safe from the effects of fire. Fireproofing refers to the systematic process (including materials and the application of materials) that provides a degree of fire resistance for protected support structures.
Intensification of sulfur processing units by oxygen enrichment and process flowsheet optimization
The consistent global trend toward improvements in air quality and tighter regulations on emissions, as well as the International Maritime Organization’s shipping regulations, continue to mitigate sulfur levels—not only in conventional transport fuels (petrol and diesel), but also in jet fuels, fuel oils and other heavier distillates.
Steam generator in a hydrocracker high-pressure loop—why not?
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
Maximizing diesel hydrotreater profit by multivariable optimization: A case study
A diesel hydrotreater (DHT) is a critical unit within an oil refinery. A DHT processes the diesel range fractions obtained from different units of the refinery—such as from the crude distillation unit and the delayed coker unit—to adhere to diesel fuel market specifications.

- Carbon capture tops agenda at GPAE Conference 2025 6/17
- INEOS to cease phenol production at German site, cites high European energy costs and CO2 tax policy 6/17
- Petrobras signs $892 MM in contracts to complete RNEST Train 2 refinery expansion 6/17
- China's May refinery throughput at 9-month low on plant overhauls (1) 6/17
- bp completes turnaround work at 250,000-bpd refinery in Washington (U.S.) 6/17
- Japan's Eneos restarts 77,000-bpd Kawasaki CDU after unplanned shutdown 6/17