Environment & Safety
Thermal oxidizing systems
Test your knowledge to improve your refinery’s safety and reliability
What is the optimum U.S. mogas sulfur content?
Simple algebraic optimization method provides the answer to this and other environmental and plant risk management questions
Improve estimations for dynamic pressure waves from an explosion
Using a polar coordinate system, engineers can estimate risks on buildings and structures during the design phase
Improve facility SIS performance and reliability
Use solenoids to partial stroke test block valves
Operator maintenance - key to reducing breakdowns
Here are the benefits and implementation procedures
Pregrouted baseplates reduce installation time and costs
Improving pump reliability is another benefit
Critical situation management – avoid the pitfalls
Guidelines are based on over 50 projects
Improving reliability of chemical processing facilities
An enterprise reliability management system offers powerful failure analysis capabilities
Include your field work force in the automation loop
New technologies reduce maintenance costs and increase productivity
Optimize FCC flue-gas emission control—Part 2
Regenerator design plays a crucial role when limiting NOx emissions
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
- Vietnam says its refineries not yet affected by Middle East tensions 6/26
- PureFive™ resin advances toward qualification with Procter & Gamble brands 6/26
- Gulf Energy Information and CompareNetworks announce strategic media partnership to elevate pharma and lab content at ChemE Show 2026 6/26
- Update: Brazil raises biofuel levels, sees gasoline self-sufficiency 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction