Engineering & Design
Human-machine interfaces are the future of petrochemical refining
 Corey Foster represents Valin Corp. in the Northern California automation market. Valin is a technical solutions provider for the technology, energy, life sciences, natural resources and transpo..
CB&I wins FEED work from Gazprom to develop new Russian refinery
CB&I's project scope includes FEED development for multiple new process units, including a 2 million tpy hydrocracker unit licensed by Chevron Lummus, as well as hydrogen, sulfur and other associated units.
Gazprom appoints WorleyParsons as contractor for Vladivostok LNG
The WorleyParsons portion of the project includes the FEED deliverables for two 5 million tpy LNG trains with supporting utilities and infrastructure including loading terminal topsides.
Honeywell to automate, provide FEED work on new mega-refinery in Kuwait
With a planned capacity of 615,000 bpd, the new Al Zour refining complex being built in southern Kuwait will be Kuwait’s fourth refinery and the largest refinery in the entire Middle East.
OxyChem, Mexichem choose contractor for new US ethylene cracker
CB&I was awarded the $1 billion engineering and construction contract to build an ethylene cracker with 1.2 billion lb/year of capacity at OxyChem's existing complex in Ingleside, Texas.
Optimize relief loads with dynamic simulation
Pressure relief analysis is a critical task at the engineering design stage of a grassroots oil refinery project. Relief loads must be determined so that the process units and plant flare systems can be designed.
Mitigate heat exchanger corrosion with better construction materials
Better materials can provide optimal equipment service life, reduce maintenance, mitigate contamination by corrosion products and minimize heat loss due to fouling.
Video game technology transforms operator training
Thanks to advances in gaming technology with detailed 3D modeling, it has become practical, affordable and quick to create a navigable, hyper-real equivalent of a facility.
Top HPI Projects
Construction of HPI projects involves numerous risks for several parties. The design and construction of such complexes can take years, from project announcement to commissioning of the complexes. The..
Mitigate fouling in crude unit overhead—Part 3
CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..
- China's first coal-to-chemicals project with green hydrogen starts commercial operations 11/20
- Norsk e-Fuel and Braskem partner to turn captured carbon into long-lasting products 11/20
- Nigeria's Dangote refinery delays CDU maintenance to end of January 2026 11/20
- Technimont attends ground-breaking ceremony of Tengiz Gas separation Complex in Kazakhstan 11/20
- 42% of U.S. energy/critical infrastructure providers exposed to weaponized AI and email attacks 11/20
- EIA: U.S. crude stocks fall on higher demand, fuel inventories rise 11/20

