Engineering & Design
Linde opens new Houston engineering offices
With the recently announced $200 million investment to build a large air separation unit (ASU), a new gasification train and supporting equipment and facilities in La Porte, Texas, the new offices provide space to support activities surrounding those projects, according to Linde officials.
Technip wins engineering for new China LNG plant
The contract covers the conceptual engineering study, the basic engineering design for its processes, BED and detailed design of the LNG storage tank, and procurement of key equipment.
Optimize your compressor maintenance program
One deviation alone might not be enough to bring on a compressor failure, but, when several more deviations combine, the failure risk is known to increase exponentially.
Case history: Failure analysis of a syngas compressor
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
Improve pressure drop calculations for saturated water lines
When saturated water flows through pipes and components, it flashes—thus increasing its specific volume and limiting the fluid flowrate. Due to these conditions, the calculation and design for pi..
Achieve uniform heat flux in a coker furnace
A delayed coker unit thermally cracks vacuum residue (VR) and converts it into products like liquefied petroleum gas (LPG), naphtha, gasoil and petroleum coke. A majority of the thermal cracking takes..
HP Reliability: Four-stage, low-flow process centrifugal compressor can fill important industry gaps
In the 1970s and 1980s, multistage centrifugal compressors in the 3,000 acfm (about 5,000m3/hr) and lower flow ranges were largely confined to instrument and plant air duties. Three stages with interc..
HP Integration Strategies: Consider procedural automation at a commercial-scale pilot plant
“All processes are batch processes to some degree. Even in ‘continuous’ process plants, processing units will need to be shut down at some point and then restarted to resume production...
HP Boxscore Construction Analysis: Outlook for major revamp projects—Part 2
Worldwide, refiners are investing billions in upgrading and modernizing projects. These efforts are focused on:Increasing flexibility to process heavier, sourer crudesImproving energy efficiencyMeetin..
HP Engineering Case Histories: Case 74: How to determine impact forces when troubleshooting
When troubleshooting failures, it is not unusual for the metallurgical report to indicate that the failure was the result of an impact type of force. The investigator who receives this information mus..

- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26