Engineering & Design
Using ANN modeling to predict the melt flow index in real time
Controlling polymer quality during manufacturing is a significant challenge due to the cost, maintenance and reliability of online measurements of final product quality.
Choosing an FCCU CO promoter is no longer driven by NOx emissions
Fluidized catalytic cracking units (FCCUs) form coke during the reaction that combusts in the regenerator and supplies heat for the process.
Digital: Digital twin for refinery production optimization
Digitalization is fundamental to Repsol’s strategy for the future.
Editorial Comment: In pursuit of operational excellence: A thank you from Hydrocarbon Processing
In late September, <i>Hydrocarbon Processing</i> hosted the International Refining and Petrochemical Conference (IRPC).
Vertically suspended molten sulfur pumping challenges and best practices
The objective of this article is to share industry experience related to the reliability challenges with vertically suspended molten sulfur pumps. Due to the operating temperatures and the unique chemical properties of sulfur, several operational and reliability challenges are inherently present across the industry.
Control valve design challenges for green diesel processes
Green (or renewable) diesel is a biofuel that offers several advantages over biodiesel, so many refineries are increasingly including it in their production portfolios.
Monitoring hydrogen plant performance—Part 2
Process monitoring is an indispensable practice to keep track of KPIs of an H<sub>2</sub> plant.
Hydrocarbon Processing 2021 Awards WINNERS
<i>Hydrocarbon Processing</i>, the downstream processing sector’s leading technical publication for nearly 100 yr, has announced the winners for its fifth annual <i>HP</i> Awards, which celebrate innovative technologies and people that have been instrumental in improving facility operations over the past year.
Installation of magnetic level gauges in modularization projects
In today’s competitive world, new ways of more efficiently executing a project are being developed every day: one of these is modular construction.
Purchase order, contract or purchase agreement: Which is best for your procurement strategy?
Procuring equipment, materials and services are very important to a project’s financial success.

- AVTL to develop ammonia terminal in Pipavav, India 6/20
- Chevron seeks buyers for 50% stake in Singapore refinery 6/20
- Asian refiners seek more Mideast oil after spot premiums jump on Israel-Iran conflict 6/20
- Mexican authorities discover clandestine mini-refinery in crackdown of illegal hydrocarbon trade 6/20
- Italy's Eni eyes new unit to manage oil refineries 6/20
- Inatech's Techoil implemented by Flint Hills Resources for a modern, integrated future 6/20