Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Construction

The critical maintenance team: Do you have one?

Consultant: Thorman, G.

Larger plants typically have planners and maintenance supervisors onsite, as well as operations personnel.

The top three causes of contractor and engineering misalignment

Accruent: Eichelberger, N.

When contractors, engineers and operations teams at downstream processing plants do not work together at optimal efficiency, it can present serious problems.

Set correct design specifications for optimized piping and pipe support system

Wood Group: Maiti, S.

During the planning and engineering execution of petrochemical, oil and gas, and power projects, it is essential that the owner and engineering, procurement and construction (EPC) contractor mutually develop a comprehensive and detailed piping design specification.

How did asset utilization modeling save Sadara $1 B in capital cost?

Sadara Chemical Co.: Hayek, F.  |  Moran, M.

Sadara is a JV between Saudi Aramco and Dow Chemical.

Global Project Data

Hydrocarbon Processing Staff: Nichols, Lee

According to <i>Hydrocarbon Processing’</i>s Construction Boxscore Database, more than 320 new downstream capital projects have been announced over the past year.

Industry Perspectives: What opportunities will 2019 bring to the global HPI?

Hydrocarbon Processing Staff: Nichols, Lee

To continue communication and feedback with <i>Hydrocarbon Processing</i>’s global audience, the editors have posted a new poll to HydrocarbonProcessing.com.

Viewpoint: European refining 2050: Turning the vision into reality

KBC Advanced Technologies, Inc.: George, S.

Europe’s refiners, through their industry organization Fuels Europe, have set out their long-term ambitions in a new program called Vision 2050.

Editorial Comment: The materials that advance modern life

Hydrocarbon Processing Staff: Nichols, Lee

Refineries and petrochemical plants contain some of the harshest environments on the planet.

EPC/construction contracting—Start with the end in mind

Praxair: Ogunye, S.

Large capital projects continue to be challenged by budget issues.

Improving resource efficiency of industrial processes with the TOP-REF methodology—Part 2

TU Dortmund University: Radatz, H.  |  Schembecker, G.
The CoSMo Company SAS: Raffray, G.  |  Sellis, D.
Fundación Tecnalia Research and Innovation: Boto, F.  |  Echeverria, Z.
Fundación CIRCE—Centro de Investigación de Recursos y Consumos Energéticos: Carrion, A.  |  Herce, C.  |  Oto, F.
University of Zaragoza: Gil, A.
DOW Chemical Co.: Arias, A.  |  Borrego, R.
Fertinagro Nutrientes S.L.: Romero, J.
Petróleos de Portugal: Jacinto, J. T.

The European TOP-REF research consortium has developed and applied a methodology to improve the resource efficiency of industrial production processes.