Construction
SunGas Renewables' $2-B Beaver Lake Renewable Energy Project enters final stage of development
SunGas Renewables Inc. announced the start of front-end engineering design (FEED), marking the beginning of the final stage of development for its flagship project, Beaver Lake Renewable Energy.
Vioneo appoints Wood to design world’s first industrial scale fossil-free plastics facility
Vioneo has awarded Wood a contract to deliver the front-end engineering design for its revolutionary plant which will produce fossil-free plastics using green methanol.
Maire subsidiaries awarded various contracts worth approximately $1.1 B
MAIRE announced that its subsidiaries TECNIMONT and KT-Kinetics Technology have been granted new awards for a total amount of approximately $1.1 B for engineering, procurement and construction activities related to gas treatment infrastructures, as well as high-value added engineering services provided by NEXTCHEM's group companies for the development of biofuel facilities.
Hydrocarbon value chain optimization: Non-CAPEX opportunities to improve gross margins for the downstream sector—Part 2
Part 2 will outline additional opportunities across quality giveaway reduction, hydrocarbon loss measurement, refinery mass balance and energy management in downstream functions without the need for capital expenditure (CAPEX) or software infrastructure upgrades.
Repsol surpasses 1,000 service stations with 100% renewable Nexa Diesel
The multi-energy company's goal is to end the year with 1,500 service stations offering this fuel in the Iberian Peninsula.
Methanex announces the successful restart of 1.8-MMtpy Geismar 3 plant in Louisiana (U.S.)
Methanex Corporation announced that its 1.8-MMtpy methanol plant, Geismar 3 (G3), in Geismar, Louisiana (U.S.) has successfully restarted and begun producing methanol following an unplanned outage in late February.
Synergize FCCUs and hydrocracking processing units to maximize refining margins—Part 2
Part 1 of this article appeared in the February issue. Part 2 here will explore the role of FCC and hydrocracking in crude-to-chemicals and the challenge of cracked feeds, among other topics.
Heat exchanger modifications during hydrocracking and lube oil basestock units’ revamp at BPCL’s Mumbai refinery
This article provides insights into several possibilities for modifying heat exchangers that will help refinery owners/operators and consultants to plan similar revamp activities.
Phase-gate process for optimal turnaround performance: Long-range turnaround planning
The volume of turnaround (TAR) work in a limited physical space and within a compressed timeframe presents challenges for securing the required qualified workforce and ensuring quality control and health, safety and environment. For these reasons, excellent TAR planning is critical for successful outcomes.
The role of coatings in the transition to renewable feedstocks
One often overlooked aspect of the shift to renewable feedstocks involves the critical role of coatings in protecting infrastructure. While advanced coatings have long supported the industry, new innovations must address the evolving demands of renewable feedstocks. These enhanced coatings will safeguard infrastructure from the more aggressive chemical environments introduced by renewable feedstocks, ensuring long-term durability and operational efficiency.

- LyondellBasell to sell select European petrochemical assets to AEQUITA 6/9
- Ebara Elliott Energy signs high-speed balancing bunker agreement to expand Middle East footprint 6/9
- Rotork joins Rockwell Automation’s Technology Partner Program 6/9
- California (U.S.) fuel imports hit 4-yr high amid refinery outages 6/9
- Finavia's Helsinki Airport uses Neste MY Renewable Diesel to drive operations to net-zero carbon emissions 6/9
- Honeywell drives industrial transition from automation to autonomy with new AI-enabled digital suite 6/9