Construction
KBR Awarded FEED for Kitimat LNG Development
Houston-based KBR announced that it has been awarded a front-end engineering and design (FEED) contract by KM LNG Operating General Partnership for the Kitimat Liquefied Natural Gas (LNG) Development near Kitimat, British Columbia, Canada.
Foster Wheeler and consortium partners sign GES+ contract with Saudi Aramco
Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group together with the subsidiary’s consortium partners comprising A. Al-Saihati, A. Fattani & O. Al-Othman Consulting Engineering Co., (SOFCON) and Saudi Consolidated Engineering Company- Khatib & Alami (SCEC K&A) have signed a contract with Saudi Aramco for the provision of services associated with Saudi Aramco’s General Engineering Services Plus (GES+) initiative for a duration of five years with options available for extensions.
Foster Wheeler studying ZADCO in the UAE
Foster Wheeler AG’s Global Engineering and Construction Group has received a contract from Zakum Development Company (ZADCO), to perform an availability and reliability study in connection with the expansion of the Zirku oil processing facilities in Abu Dhabi, UAE.
Improving pH control mitigates corrosion in crude units
Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections
Avoid brittle fracture in pressure vessels
Key points identify effects from auto-refrigeration on steel vessels
Flare stack structure revamp: A case history
An innovative approach was used to repair an older flare structure online without an extensive shutdown
Process safety: Blind spots and red flags
Improving safety for organizations involve more than technological solutions; understanding processes and plant interactions are a must
Case 61: Pressure loss in a reactor
Much information is available from a simple analysis
HP Water Management: Passivation in cooling water circuits
Passivation—the formation of a corrosion-resistant oxide on a clean metal surface—is the key to optimizing system reliability on the waterside of heat exchangers. Most plant personnel are aw..
How would you rate leadership of your capital projects?
To achieve substantially improved benchmarks in project performance, profound change is needed

- Mideast conflict turbocharges diesel prices, squeezing Europe 6/23
- Pertamina is looking to import > 200,000/month of 90-octane gasoline 6/23
- Japan will mitigate potential gasoline price spike, prime minister says 6/23
- Linde to invest $400 MM to build the world-scale air separation unit 6/23
- OEG signs major partnership agreement in Qatar 6/23
- U.S. Supreme Court lets fuel producers challenge California emissions standards 6/23