Compressors
How the inertia number points to compressor system design challenges
Maintenance & Reliability
/ Process Optimization
/ Compressors
/ Engineering & Design
/ Rotating Equipment
It facilitates predicting compressor system performance
Case 57: Troubleshooting the cause of sudden impacts
Maintenance & Reliability
/ Compressors
/ Drivers
/ Economics
/ Engineering & Design
/ Motors
/ Piping
/ Pumps
/ Rotating Equipment
/ Safety
Finding the cause can be elusive but calculations help
Burckhardt Compression delivers process gas compressors to hydrogen plant in Rotterdam
A call was placed to Burkhardt Compression that resulted in three new process gas compressors being delivered in April to the plant. The responsible contractor for the project is Air Liquide’s subsidiary Lurgi GmbH.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Verso Energy awards FEED contract to Rely for the DEZiR eSAF project 11/17
- Iran confirms seizure of tanker with petrochemical cargo headed for Singapore 11/17
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

