Boilers
Enhance operation and reliability of dividing-wall columns
Dividing wall columns (DWCs) are an attractive option when the goals are to reduce energy consumption and capital investment for distillation processes. A major component in a DWC system is the reflux..
Improve the performance of your existing steam system
This discussion tracks a material flow through the steam system, starting with feed and continuing with steam generation, steam uses and, finally, condensate recovery.
Improve your plantwide steam network
When optimizing an existing steam network, design and process engineers need a complete understanding of all aspects of the existing system. Accurate energy and material balances must be established.
HP Water Management: Need a package boiler in a hurry?
Acquiring a package boiler is an unplanned event that requires process engineers to solve this completely unfamiliar problem. To reduce the chaos of replacing them, here are helpful ways to resolve this situation.
HP Integration Strategies: The energy water nexus
Whether or not you subscribe to the global warming and “peak oil” arguments, it is clear to almost everyone in the industrial world that “business as usual” is not sustainable inde..
Foster Wheeler to design Korean steam generator
A subsidiary of Foster Wheeler AG's Global Power group has been awarded a contract by Doosan Heavy Industries & Construction Co. Ltd. for cooperation in the design of a circulating fluidized-bed steam generator for Korea South East Power Co. Ltd.
What are the benefits of rigorous modeling in heat exchanger design?
This article examines three applications where rigorous heat exchanger models can boost value derived from process simulation and provide more accurate results.
Prevent external corrosion of boiler tubes under refractory lining
A leak developed on the water wall for several boiler tubes within five months of the commissioning of a plant boiler. In this case, the boiler tubes were partially covered with a castable refractory ..
HP Water Management: Avoid failures in water projects: Part 2
Last month, we discussed the need for project engineers to talk to process engineers about the water systems as a capital project takes shape. This month’s column discusses additional ways to bri..
Achieve optimal heat recovery in a kettle exchanger
Improve operations by avoiding buildup of sensible duty or by using baffles
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14