Asia/Pacific
BASF to expand India emissions catalysts capacity
Construction of a new 47,000 square meter facility will begin in December 2013, enhancing the company’s existing emissions catalysts operation in Chennai with new production lines and manufacturing capabilities. Startup is of the new catalyst capacity is planned in the first quarter of 2015.
Shell floats hull for massive Prelude FLNG facility
Once complete, Prelude FLNG will be the largest floating facility ever built. It will unlock new energy resources offshore and produce approximately 3.6 million tpy of LNG to meet growing demand.
Optimize relief loads with dynamic simulation
Pressure relief analysis is a critical task at the engineering design stage of a grassroots oil refinery project. Relief loads must be determined so that the process units and plant flare systems can be designed.
Mitigate heat exchanger corrosion with better construction materials
Better materials can provide optimal equipment service life, reduce maintenance, mitigate contamination by corrosion products and minimize heat loss due to fouling.
Top HPI Projects
Construction of HPI projects involves numerous risks for several parties. The design and construction of such complexes can take years, from project announcement to commissioning of the complexes. The..
Mitigate fouling in crude unit overhead—Part 3
CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..
Rethink the hazards in your process
In designing process safety systems, “more” is not necessarily better. Advanced technology has created a mindset to over-install hardware to prevent or to reduce the risk of failure in hydro..
Consider process-based failure analysis methods for piping and equipment
Avoiding incident (or accident) recurrences at industrial systems is a long-standing problem, and it involves process safety strategies (PSSs). Incurring zero incidents is the ultimate goal for any st..
HP Reliability: Demand specifics in designing your asset management programs
In 2009, an automation journal commissioned an online survey asking industry observers and practitioners to rank technology trends in 2009 and beyond.1 Table 1 summarizes the respondents’ prefere..
HP Integration Strategies: Engineering design tools are moving to the ‘cloud’
According to a new market study on engineering design tools, new 3D design applications can play an integral part in determining the optimal design, creation and construction of HPI facilities.
- thyssenkrupp Uhde selected by Dangote Fertilizer Ltd. to license four urea granulation units in Nigeria 11/21
- China's first coal-to-chemicals project with green hydrogen starts commercial operations 11/20
- Norsk e-Fuel and Braskem partner to turn captured carbon into long-lasting products 11/20
- Nigeria's Dangote refinery delays CDU maintenance to end of January 2026 11/20
- Tecnimont attends ground-breaking ceremony of Tengiz Gas separation Complex in Kazakhstan 11/20
- 42% of U.S. energy/critical infrastructure providers exposed to weaponized AI and email attacks 11/20

