Zardynezhad, S.
Shahab Zardynezhad, PMP, is a registered Senior Mechanical Equipment Engineer in Alberta. He has 24 yr of experience working on many of the world’s largest oil, gas and petrochemical projects. His areas of specialization and industrial experience include engineering, design, procurement, inspection, installation, startup, maintenance, troubleshooting of general and special-purpose rotating equipment, with special concern on project management subjects and “fitness-for-purpose” consideration. He holds a BS degree in mechanical engineering from the University of Petroleum, an MS degree in industrial engineering from I.U.S.T, and a MEng degree in project management from the University of Calgary.
Perform field oil flushing for successful centrifugal gas compressor startup
Many factors are necessary for a successful compressor startup. One of the key actions is conducting high-quality field oil flushing during the precommissioning stage, or after a major overhaul.
Achieve successful compressor startup by addressing dry-gas seal failure
A common root cause for compressor failure during first startup is a failure of the dry-gas seal (DGS) system. To avoid failures of gas compressors, the project team and end users must understand the importance and significance of the DGS very early in the basic design phase.
- 1
- ... 1 pages
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22

