Hall, K. R.
Improved equations for the Standing-Katz tables
Using these calculations can predict natural gas density and improve flowrates
The design benefit method: Allocate joint costs among shared products
This accounting technique can provide more accurate results than traditional practices
Consider slotted orifice flowmeters
Accuracy can be an order of magnitude better with less permanent head loss
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Envision Energy powers world's first green marine ammonia bunkering 7/25
- New catalyst breakthrough could make clean ammonia easier to produce 7/25
- U.S. Gulf refiners seek Middle East, S. American oil to offset Venezuela, Mexico losses 7/25
- CEO of Russia-backed Indian refiner Nayara resigns after EU sanctions 7/25
- PetroChina makes FID for new northeast refinery complex 7/25
- Valero Energy beats Q2 profit estimates as refining margins improve 7/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction