Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

D. Smith

Smith & Burgess LLC, Houston, Texas

Dustin Smith earned a BS degree in chemical engineering from Texas A&M University and is a licensed professional engineer. He co-founded Smith & Burgess in 2007 and serves as Co-Owner and CEO. With more than 25 yr of experience, he specializes in relief systems design, PSM compliance audits, flare system optimization and incident investigations. Smith has contributed to API 520/521 committees and led projects that improved safety, compliance and operational efficiency for clients globally.

Improve relief-device sizing under supercritical conditions

Smith & Burgess LLC: D. Smith
Smith and Burgess LLC: Burgess, J.

Properly sized relief devices under supercritical conditions are vital to processing natural gas and gas condensates into olefins. These processes operate near the critical locus of the process gases ..

Address inlet pressure loss concerns with restricted lift relief devices

Smith & Burgess LLC: D. Smith
Bechtel Corp.: Yoram, S.

For the past 30 years, standard-sized relief devices have been sized such that it is difficult to meet the installation criteria in American Petroleum Institute (API) standard (STD) 520. This problem ..

Evaluate pressure relief system forces in existing installations

Smith & Burgess LLC: D. Smith  |  White, J.
Frenk Water Technologies LLC: Frenk, B.

The purpose of this study is to limit the number of relief valves that require rigorous engineering calculations to determine the adequacy of the installation.

Relief valve and flare action items: What plant engineers should know

Smith & Burgess LLC: D. Smith
Smith and Burgess LLC: Burgess, J.

This article can help the plant engineer review the concerns developed by the design engineer. Implementing field modifications without performing such a review is costly and exposes a facility to unjustified risks.

Relief device inlet piping: Beyond the 3 percent rule

Smith & Burgess LLC: D. Smith
Smith and Burgess LLC: Burgess, J.
Smith and Burgess: Powers, C.

With careful consideration, an engineer can be certain that an installation will not chatter

Ensuring safe operations when fulfilling action item requirements

Smith & Burgess LLC: D. Smith  |  White, J.

Consider implementing this criteria to accurately document the process

  • 1
  • ... 1 pages