Russell, M. T.
Matthew T. Russell is Vice President, Gas-to-Power, LNG for Siemens’ Power and Gas Business. He is responsible for Siemens’ global LNG portfolio inclusive of strategy, business development and captive finance. Mr. Russell joined Siemens in 2017 following a 10-yr career at KBR. Mr. Russell earned a bachelor’s degree in civil engineering from Ohio State University in 2003, and received a master’s degree in business from the University of Delaware in 2007.
How APM in LNG operations can lower TCO and boost ROI
Gas Processing/LNG
/ Process Control
/ Analyzers
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
/ Safety
As the world’s hydrocarbon appetite continues its rapid turn toward lighter fare (e.g., natural gas for power generation, transportation and industry), massive, near-term investments in global, capital-intensive, fully digitalized LNG infrastructure are needed.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

