Al-Warthan, A.
Abdullah Al-Warthan is a Process Engineer at Saudi Aramco with demonstrated experience in upstream operations. He has 8 yr of experience in gas operation fields as he led the commissioning of the gas treat unit in one of Saudi Aramco’s main facilities (Fadhili Gas Plant). Prior to that, he was assigned as a Lead Process Engineer at the Khursaniyah Gas Plant. Mr. Al-Warthan holds an energy auditor certificate.
Soft startup of best practices for the commissioning of amine plants
The startup and commissioning of hydrocarbon plants can present unique challenges that, if not anticipated and addressed in the pre-commissioning and commissioning periods, will inhibit plant startup and increase the difficulty of achieving product specifications in a timely manner.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
- Phillips 66 announces agreement to purchase remaining interest in WRB Refining LP for $1.4 B 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction