Al Turiki, A.
Abdullah Al Turiki is a Khurais Producing Department Technical Advisor with more than 15 yr of experience in rotating equipment. He joined the company as a machinist and then focused on rotating equipment after joining the reliability unit as a technical advisor. His experience includes troubleshooting, condition monitoring and leading reliability programs. The author can be reached at Abdulah.turiki@aramco.com.
High-pressure gas compressor dry gas seal system enhancement case study
The Khurais producing department (KhPD) consists of four oil trains: each oil train is responsible for receiving, stabilizing and purifying the crude oil from the wells by removing sand, water, gas and hydrogen sulfide (H2S) contents to make the oil ready for use and shipment to refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

