Malhotra, K.
Kapil Malhotra is a Heat Transfer Engineer at S&B Engineers and Constructors. He has more than 20 yr of experience in the design, engineering and troubleshooting of fired heaters, combustion systems and thermal equipment. Malhotra has also authored several technical papers on heat transfer. He earned an MS degree in mechanical engineering from Oklahoma State University.
Rethink specifications for fired heaters
Fired heaters are essential and important major pieces of equipment in a process plant.
Improve the operation of fired heaters
Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Americas
/ Analyzers
/ Asia/Pacific
/ Boilers
/ Construction
/ Crude oil
/ Drying
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Information Systems
/ Middle East
/ Naphtha
/ Natural Gas
/ Safety
/ Treating
/ Utilities
Fired heaters or “process furnaces” are used extensively by the refining and petrochemical industries. These heat transfer units generate the much needed process energy through the combustio..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

