Tellini, M.
Low-pressure absorption of CO2 from flue gas: Plant economics with incentives
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Europe
/ Greenhouse Gases
/ Loss Prevention
/ Middle East
The precedent to this article, published in the April 2011 issue of Hydrocarbon Processing, discussed the chemical feasibility and process engineering design to absorb carbon dioxide (CO2) from flue g..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

