Mosir, M.
Marina Mosir has more than 15 yr of work experiences in the refining and natural gas/LNG industry as a Process Engineer, Lead Process Engineer and Engineering Manager for various Petronas operating units and capital projects. She is a mass transfer design expert within Petronas, with more than 12 yr of experience in revamping, troubleshooting and designing distillation columns and separators.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

