Mokhtar, I. S. A. M.
Ir. Saiful Anuar Mohd Mokhtar has more than 18 yr of work experience in the refining, natural gas/LNG and petrochemical sectors as an Engineering Manager and Head Process Engineer for various Petronas capital projects. At present, he is the Head Process Engineer for Petronas Chemical Group’s titanium program. Mr. Mokhtar is a Chartered Chemical Engineer (CEng) with IChemE and a Professional Engineer (PEng) with the Board of Engineers Malaysia.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- USA BioEnergy secures Johnson Matthey and Honeywell technologies for new SAF facility in Texas (U.S.) 9/10
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction