Schnittker, D.
Dour Schnittker is the VP of engineering at KP Engineering and has vast experience serving in technical and leadership roles in the downstream sector spanning 43 yr. He began his career at Placid Oil Co. in 1977 and transitioned to CB&I, where he led global project management before joining KP Engineering in 2017. Mr. Schnittker earned a BS degree in chemical engineering from Texas A&M University.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

