Dokhkan, A.
works in the Petroleum Refinery of Jordan as the section head of the refinery process unit’s development. He is also responsible for the refinery’s process safety projects and studies. Mr. Dokhkan has worked for over 12 years in oil refining processes and technical safety, and he is a certified functional safety professional (CFSP) and a certified occupational safety practitioner.
Prevent the overfilling of storage tanks
Overfilling storage tanks, especially those with large inventories of toxic or flammable material, has always been a safety concern for site owners and operators.
Estimate equilibrium flash vaporization curves accurately
A computer program simplifies methods of true boiling point curves in design applications
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

