Van Wagenberg, M.
Mauriyd Van Wagenberg is President of IBASC, an engineering management and research firm, and has extensive experience in tracking the health of engineering organizations and of the engineering execution on complex plants. Dr. Van Wagenberg has worked for more than 30 years in the field of improving engineering performance and on project risk analysis. He has performed comparative analysis among organizations and developed ways to fine-tune engineering execution toward specific project needs. Dr. Van Wagenberg has written papers on design performance, owner/EPC relationships, developments in industrial areas, and energy transformation. He completed his PhD in industrial organization from Radboud University in the Netherlands.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

