Oleszczuk, G.
has worked in control and optimization industrial processes for 15 years, with more than eight years at Honeywell as an advanced solutions operation leader. He has implemented several APC and OTS solutions across Europe and North Africa. Dr. Oleszczuk gained his PhD in automation and dynamics at Old Dominion University in Virginia, and an MSc degree in chemical engineering and automation control at Warsaw University of Technology in Poland. He specializes in process dynamics modeling.
Utilize APC solutions to resolve hydrocracker conversion optimization challenges
Petrochemicals
/ Process Control
/ Refining
/ Diesel
/ Hydrocracking
/ Information Systems
/ Naphtha
Improving profits and reducing costs remain priorities for owner/operators and management.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

