Markham, N.
Nathan Markham graduated from the University of Kansas with a BS degree in chemical engineering in May 2009. He works as a Process Safety Engineer for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- USA BioEnergy secures Johnson Matthey and Honeywell technologies for new SAF facility in Texas (U.S.) 9/10
- BASF launches the world’s first thermoplastic polyamide with high water permeability 9/9
- Worley awarded FEED contract for renewable diesel and aviation fuel project in Sweden 9/9
- U.S. tariffs worsen petrochemical sector challenges, executives warn 9/9
- Clariant to supply catalyst to SYPOX for world’s largest electric steam methane reformer 9/9
- Mitsubishi Chemical to adopt a "product traceability platform" to build a reliable chemical recycling supply chain 9/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction