Sharma, B. K.
Brijesh Kumar Sharma is a Mechanical Engineer at Fluor Daniel India Pvt. Ltd. He holds a BE degree in engineering from the Sant Longowal Institute of Engineering and Technology in Longowal, India.
Determine the design metal temperature for a secondary reformer
An air-burning system should be designed so that there is no maintenance required between scheduled shutdowns every two years. To achieve this, a metal temperature study should be carried out for the design of the pressure parts and for the refractory design.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras delivers LPG sold at steep premiums despite Lula move to annul auction 4/3
- Plug Power to supply 275-MW GenEco electrolyzer system for Hy2gen’s Courant decarbonized ammonium nitrate project 4/3
- Vietnam refinery boosting jet fuel production 4/3
- China plans to upgrade some petrochemical plants, phase out others by 2029 4/3
- Morocco has diesel stocks for 51 days, energy ministry says 4/3
- Nigeria's Seplat Energy hit by strike amid push for higher output 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

