Laturkar, K.
Kaustubh Laturkar works as an Engineer at the Facility for Rare Isotope Beams, a U.S. Department of Energy (DOE) project in Michigan. He has more than 9 yr of experience working in the field of process engineering, refinery operations, utility systems design and operation, with a special focus on design and commissioning of engineering systems. Laturkar earned an MS degree in chemical engineering from University of Florida and a BE degree in chemical engineering from Panjab University, Chandigarh, India. The author can be reached at kos19188@gmail.com.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Consortium launches study to create a consolidated hub for recycled plastics 5/22
- Eni strengthens its global LNG strategy with long-term supply agreements in Indonesia 5/22
- Breakthrough shows how electricity could replace heat to turn CO₂ into useful chemicals 5/22
- bp's Whiting Refinery offers revised proposal to union in ongoing talks 5/22
- Plains oil pipeline partly shut down after rupture in East Los Angeles (U.S.), could disrupt supplies to refineries 5/22
- Vitol moves to open Mexico fuel terminal years after bribery scandal 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

