Batra, K.
Kapil Batra works as Deputy Manager in the heat transfer department at Engineers India Ltd. in New Delhi. Mr. Batra has a progressive work experience of 8 yr in fired heaters and combustion systems. He is a chemical engineering graduate from the Laxminarayan Institute of Technology (LIT)-Nagpur.
Embrace tube metal temperature factor (FT) in fired heater design
Fired heaters are one of the most critical pieces of equipment in a refinery. They
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asian gasoline margin spikes to highest since August 2023 11/14
- Lukoil-Moldova grants free use of airport fuel terminal to government amid U.S. sanctions 11/14
- Croatia rejects Russian vacuum gasoil cargo after U.S. sanctions 11/14
- Bulgaria wins UK sanctions reprieve on refinery, petrol stations 11/14
- China's Sinochem shuts one crude unit at Quanzhou after fire 11/14
- Enbridge approves $1.4-B project to boost Canadian oil flows to U.S. refiners 11/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

