Mark Indgjer joined Det-Tronics in 2017 as an Applications Engineer for F&G safety systems. He has held a variety of roles in the fire industry for more than 25 yr. At present, he provides systems applications support and training for Det-Tronics. Mr. Indgjer holds a BS degree in marketing and is NICET Level II certified.
Integrating fire and gas safety with process control systems: Why, what and how
Environment & Safety
/ Gas Processing/LNG
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Americas
/ Asia/Pacific
/ Middle East
/ Petrochemicals
/ Loss Prevention
/ Refining
/ Safety
If a fire, smoke or gas leak is detected in a hydrocarbon processing facility, prescriptive actions must be taken by the fire and gas (F&G) safety system, as well as by the process control system (PCS), to mitigate and control the hazard.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indian Oil buys first Colombian oil under Ecopetrol contract 12/31
- Ukrainian drone attack sparks fire, damages equipment at Tuapse refinery 12/31
- Chile's $2.5-B Volta green ammonia project wins environmental permit 12/31
- China begins issuing second batch of 2026 crude import quotas to refiners 12/31
- EIA: U.S. crude, fuel inventories rose in the week ended December 19 12/30
- Ghana's Tema oil refinery restarts after 9-yr shutdown 12/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction