Kumar, S.
LNG import terminal on a gravity base structure offshore
An alternative design to a land-based facility is a compact, modular construction resting on the seabed
Material selection for low-temperature applications
Analysis shows conventional metallurgy is usually adequate for process upsets
Use extractive distillation to simplify petrochemical processes
Advances in solvent technology enable using extraction methods to separate close boiling point compounds cost-effectively
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Transitional Industries and CFEnergia sign feedstock supply contract for $3.3-B Pacifico Mexinol project 2/17
- Neste and World Fuel Services extend partnership, expanding SAF availability at more than 100 airports in Europe 2/17
- U.S. refined product exports by tanker increase to > 6.3 MMbpd in January 2/17
- Japan's oil and gas independence climbs to highest since 2009 2/17
- Dangote signs $400-MM equipment deal with China's XCMG to speed up refinery expansion 2/17
- Former Lukoil-owned ISAB refinery in Sicily exits crisis procedure 2/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

